Telefon
Telegram
WhatsApp
İnstagram

Bagfaş Sulfuric Acid Plant / Mastır Energy

• 14 m Sulfur Tank Revision (321 – 1.4541 Stainless Steel Cladding Work)

Esan Çine Quartz

• 20-Ton Air Duct Revision (CS Material)

Esan Balya Lead-Zinc Plant

• Process Piping Dismantling and Installation Works• Derring Screen Revision Works

Hydro-Gen 2×255 MW

• Air Duct Internal Cladding Work• 10,000 WDI CS Pipe Installation

Polyak Eynez

• Magnetic Tank Internal Cladding Work

Hydro-Gen 2×255 MW

• Gas Inlet Compensator Revision

Hydro-Gen 2×255 MW

• Gas Inlet Compensator Revision• ASH Cooler General Mechanical Maintenance• ASH ...